2024 Ultimate Ski Helmet Guide - From Pro Racing to Leisure Skiing Protection
2024 Ultimate Ski Helmet Guide - From Pro Racing to Leisure Skiing Protection 2024 Ultimate Ski Helmet Guide - From Pro Racing to Leisure Skiing Protection
Cart(0)
Home Motorcycle Helmets Retro Rider Helmets
Product Details

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Troy Lee Designs Flowline SE MTB Helmet with MIPS - Radian - Flo Yellow - 2023
  • Flo Yellow
  • X-Small/Small
  • Medium/Large
  • X-Large/2X-Large

$ 159.99

$ 48.00

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
2024 Ultimate Ski Helmet Guide - From Pro Racing to Leisure Skiing Protection
Your cart is currently empty.